11 Cubic Meter Factory Sales-Class 2- Ge Series Eo Sterilization for Disposable Sheets

Customization: Available
Theory: Gas Sterilization
Type: Gas Sterilization Equipments

Product Description

📋 Basic Information
Model NO.:BCS
Certification:CE
Material:Stainless Steel
Doors Type:Pneumatic Sliding/Revolving Door
Specification:1cbm to 100cbm
Service:3D Design & Technical Support
⚙️ Product Description
EO Sterilization Equipment
Volume Pallet Inner Size Sliding Door Size Inner Wall Door Wall Weight
1m³/1400*700*10001750*1270*15206mm6mm1t
2m³/1650*1000*12002070*2520*17206mm6mm2t
5m³2*(1200*1000)2250*1350*17002670*3220*22208mm6mm4.5t
10m³4*(1200*1000)4500*1350*17004920*3220*22206mm8mm7t
20m³7*(1200*1000)7500*1350*20007920*3220*25208mm8mm12t
52m³13*(1200*1000)13900*1400*270014320*3320*32208mm10mm28t
101m³32*(1200*1000)17050*2700*220017510*3300*27808mm10mm45t
📷 Detailed Gallery
Detail View 1
Detail View 2
Technical Specifications
🏭 Production & Quality
Production Line 1
Production Line 2
QC Control
Packaging
❓ Frequently Asked Questions
✦ What is Ethylene Oxide (EtO) Sterilization?
Ethylene oxide is a gas widely used to sterilize more than 50% of medical devices. It is highly effective due to its penetration properties, allowing sterilization of products in their final sealed packaging.
✦ What are the advantages of using EtO sterilization?
It operates at low temperatures to maintain product characteristics, offers the best material compatibility, and has broad microbicidal activity. It is cost-effective for large volumes and can sterilize products with electronics or batteries.
✦ Which medical instruments are suitable for this equipment?
It is ideal for endoscopes, plastic/rubber products (syringes, catheters), surgical instruments, anesthetic vessels, and cotton fiber products like surgical gowns and bandages.
✦ What is the standard warranty period?
The mainframe of the cabinet is guaranteed for at least 5 years, the control system for 2 years, and other purchased components for 1 year.
✦ Do you provide installation and validation support?
Yes, we provide overseas installation and training. We also provide FAT, IQ, OQ documentation, and support for PQ, along with software validation.
✦ What is the production and installation lead time?
Equipment production takes 60-90 days. Installation and debugging typically require 15-60 days depending on chamber size, with IQ/OQ validation taking about 7 days.

Related Products